We built our semi-custom home in a tiny town on the South Carolina coast, and we’ve got plenty to say about it. From what everything actually cost to the projects we DIY because my husband refuses to pay someone for something he can do himself, this is where we share what we’ve learned about building a home—and a life—a little farther off the beaten path. This is real life with real numbers—and we’ve got the receipts.

Alright, I did the math so you don’t have to. And honestly, that’s heavy lifting from an English major, so you’re welcome. Let’s dive in, shall we? I know why you’re here…
The #1 question I get about our build is some version of “okay but how much per square foot?” And I get it — when you’re staring down a $500,000+ decision, you want a number you can anchor to.
Here’s the honest answer: our all-in cost came out to about $267/sq ft for the house itself, or $336/sq ft if you include the land we bought in summer 2024.
But here’s the thing I really need you to hear before you bookmark that number and run with it: the per-square-foot figure is almost meaningless without context. Our lot required a $75,000 elevated foundation, a $38,000 septic system, and $32,000 in siding we didn’t choose — we were required to have it. Those three things alone added over $145,000 before we picked a single cabinet or floor tile.
So let’s talk about what’s actually behind that number.
Our floor plan is the Meadowview American Tradition — a Cape Cod–style exterior with an open-concept main floor. The base price? $329,778.
I know. It sounds reasonable. But sadly, it isn’t the whole story.
Here’s what that base price does not include:
Even if you walked into the design center and picked absolutely nothing (which, good luck with that), you’d still need to budget for all of the above. For us, those “extras” added up to $93,000 in homesite prep alone — and that’s before a single upgrade.
Here’s our full breakdown:
And no, we didn’t go crazy. We chose level 1 quartz over granite, kept most of our cabinets modest, skipped the metal roof, and didn’t touch the outdoor kitchen. The upgrades we did choose were strategic — wood floors over carpet, a tiled primary shower, a farmhouse sink, screened porches. Things that define how a house feels every single day.
The costs that hurt weren’t the fun upgrade decisions. They were the non-negotiables that came with our specific lot.
We built on coastal rural land in Charleston County, SC. Beautiful. Walkable to water. Private. Also: expensive to build on.
Here’s what “coastal rural” meant for our budget:
Flood zone elevation requirement — $75,000 We originally wanted a sprawling one-story farmhouse. The cost to elevate a one-story was so high it completely blew our budget. The foundation alone would have been $150,000+. So we pivoted to a two-story plan and added square footage on the second floor at $140/sq ft instead of paying $300+/sq ft to elevate a larger footprint.
Septic system — $38,300 City sewer hookup? $875. Our engineered septic system required by the health department for our soil conditions? $38,300. That’s a $37,000 difference for something you will never see or think about again once it’s in the ground.
No city water — well instead — $7,900 City water hookup = $625. Our well = $7,900, plus ongoing filtration because of hard water.
Historic district siding requirement — $32,150 We’re in a historic district, which meant the Architectural Review Board had opinions about our house. Vinyl siding — which is included in Schumacher’s base price — was not allowed on the front elevation. We were required to use fiber cement (HardiePlank). We don’t regret it at all, it looks incredible, but that’s $32,000 we didn’t exactly choose to spend.
Add those up and you’re looking at $145,000+ in costs that had nothing to do with design preferences and everything to do with where we built.
There’s no universal number. Here are the factors that move it most:
The design center is a whole conversation. The short version: go in knowing your must-haves vs. nice-to-haves. Save on things you can upgrade later (light fixtures, hardware, appliances). Spend on things you can’t change without major demo (tile, flooring, shower configuration). We saved on cabinets and spent on the shower. No regrets.
If you’re building in a flat subdivision with city water and sewer? Your homesite prep might be $20,000–$30,000 instead of our $93,000. You could build the exact same Meadowview plan with the same interior upgrades and spend meaningfully less than we did — potentially $525,000 or under — simply because of land conditions.
If you’re building on rural or coastal land with elevation requirements and no city utilities? Budget 15–20% for foundation and site prep, another 15–20% for utilities, and plan for your floor plan choices to be influenced by elevation costs. We’re not exaggerating.
The per-square-foot number is only useful once you understand what’s behind it. Ours was $267/sq ft for the house — but only because $93,000 of our total went into the ground before we made a single design decision.
If you’re in the early stages of planning a Schumacher build — or you’ve got a quote in hand and you’re trying to figure out what’s reasonable — we put together a complete budget breakdown of our $668,738 build.
It includes every line item from our Schumacher quote with our actual final costs, plus honest commentary on every upgrade decision: what was worth it, what we’d skip, and what surprised us.
Get the Complete Budget Breakdown
Q: What is the average price per square foot to build with Schumacher Homes? Online you’ll see numbers like $140–$200/sq ft — but that’s the base builder cost only. Our completed 2025 Charleston build came out to $267/sq ft for the house itself, or $336/sq ft all in including land. Your number will depend heavily on your lot conditions and location.
Q: Does the price per square foot include land? No. Land is never included in builder pricing. We purchased our lot separately in summer 2024.
Q: What’s the biggest hidden cost with Schumacher Homes? For us, it was the elevated foundation ($75,000) and the septic system ($38,300). Both were non-negotiable requirements of our lot — not upgrade choices. If you’re building on rural or coastal land, get your site assessment done early so these costs don’t blindside you.
Q: Is upgrading from vinyl siding worth it? If you have a choice, it depends on your budget and your exterior. We didn’t have a choice — our historic district required fiber cement. But now that we have it, we’d choose it again. Once you see the difference between vinyl and HardiePlank®, it’s hard to unsee.
Q: How should you approach the Schumacher design center? Go in with a plan and a budget ceiling. Know what you can upgrade later (hardware, light fixtures, appliances) and what you can’t change without major expense (tile, flooring, shower layout). We saved on cabinets and splurged on the primary shower. That balance worked for us.
Q: Where can I see your complete costs? Right here: Complete Schumacher Budget Breakdown. It has every line item, our actual final costs, and honest commentary on the decisions we made.
Happy building — and email me if you have questions: hello@home-of-henderson.com